Practice areas
Operating Plant Engineering
- License-amendment-request preparation including no-significant-hazards-consideration evaluation.
- 10 CFR 50.59 screening and evaluation support.
- Design-basis-document maintenance and reconstitution.
- Engineering change packages including 10 CFR 50.65 maintenance-rule scoping.
- Equipment qualification (EQ) program support including 10 CFR 50.49 evaluations.
- Technical specification interpretation and bases-document support.
SMR & Advanced-Reactor Licensing
- NRC pre-application engagement strategy including topical report identification.
- Combined-license-application (10 CFR Part 52) section authoring on a defined-scope basis.
- Risk-informed design strategy including LMP framework support.
- Site-characterization and site-suitability evaluation strategy.
- Safeguards information handling protocol support.
Probabilistic Risk Assessment
- Internal events Level 1 and Level 2 PRA, fault-tree and event-tree work.
- External events PRA: seismic, fire (NFPA 805), high-winds, flooding.
- Significance Determination Process (SDP) support for inspection findings.
- Risk-informed in-service inspection (RI-ISI) program development.
- Risk-informed completion-time program (10 CFR 50.69) implementation support.
What we do not do
- Plant ownership or operations. We are an engineering firm.
- Construction-management or EPC roles. We coordinate with construction-management firms but we do not staff them.
- Engagements where we would be acting as the licensee's regulatory point of contact for binding submissions. The licensee owns the docket.
- Engagements involving classified national-security information. Our work is unclassified-CUI at most.